Posted on

recordreview_20250212_trr-2025-02-12-0-018_w-ocr_art_2.xml

recordreview_20250212_trr-2025-02-12-0-018_w-ocr_art_2.xml
VILLAGE OF STRATFORD Street Improvements Advertisement for Bids The Village of Stratford will accept bids until 4 p.m. (CST) on Tuesday, Feb. 25, 2025. Bids may be submitted to the office if the village clerk, 213060 Legion Street, PO Box 12, Stratford, Wl 54484. Bids will be opened at the village office, 213060 Legion Street, Stratford, Wl, at 6 p.m. on Tuesday, Feb. 25, 2025. Project No. 1: Larch St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at 20 feet east of Hwy 97 and heads east 745-Feet through Legion Street and is 36-Feet Wide. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. Project No. 2 - LRIP PROJECT: Larch St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at Legion Street heads east 1720-Feet to Monument St. and is 36-Feet Wide. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. Project No. 3: Monument St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at Larch Street heads south 985-Feet to 40-Feet before Hwy 153 and is 21-Feet Wide. This will also include milling bridge deck asphalt pavement. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. The Village of Stratfor will adjust utilities as required and will be doing the shouldering work on Project No. 3. Date: February 5, 2025 Owner: Village of Stratford By: Jamie Heindl 164315 WNAXlp
recordreview_20250212_trr-2025-02-12-0-018_w-ocr_art_2.xml
VILLAGE OF STRATFORD Street Improvements Advertisement for Bids The Village of Stratford will accept bids until 4 p.m. (CST) on Tuesday, Feb. 25, 2025. Bids may be submitted to the office if the village clerk, 213060 Legion Street, PO Box 12, Stratford, Wl 54484. Bids will be opened at the village office, 213060 Legion Street, Stratford, Wl, at 6 p.m. on Tuesday, Feb. 25, 2025. Project No. 1: Larch St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at 20 feet east of Hwy 97 and heads east 745-Feet through Legion Street and is 36-Feet Wide. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. Project No. 2 - LRIP PROJECT: Larch St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at Legion Street heads east 1720-Feet to Monument St. and is 36-Feet Wide. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. Project No. 3: Monument St. Mill 1.5-inches on entire roadway and Pave 4LT 58-28S 1.75-inches thick. Project begins at Larch Street heads south 985-Feet to 40-Feet before Hwy 153 and is 21-Feet Wide. This will also include milling bridge deck asphalt pavement. Work Includes: Traffic control and signage required per MUTCD Standards, Sweep milled surface to prep for asphalt overlay, and Tack Coat between lifts at a rate of .05 to .07 gallons per S.Y. The Village of Stratfor will adjust utilities as required and will be doing the shouldering work on Project No. 3. Date: February 5, 2025 Owner: Village of Stratford By: Jamie Heindl 164315 WNAXlp
...
LATEST NEWS