Posted on

couriersentinel_20240516_ccs-2024-05-16-a-013_art_1.xml

couriersentinel_20240516_ccs-2024-05-16-a-013_art_1.xml
application of waste shall be done in accordance with permit conditions and applicable codes. All land application sites shall be approved prior to their use. To receive a list of approved sites, or to be notifi ed of potential approvals, contact the above-named basin engineer. Proposed Phosphorus Variance: The department has determined that a water quality-based effluent limitation (WQBEL) for phosphorus is needed in this permit to protect water quality. As allowed under s. 283.15, Wis. Stats., Variance to Water Quality Standard, the permittee has requested a variance to the phosphorus WQBEL. In support of this request, the permittee has submitted documentation intended to demonstrate eligibility for the variance based on applicable factors. The department concurs with the demonstration, however this concurrence is subject to U.S. EPA approval, before the variance limit may be included in the final reissued permit. In an effort to achieve phosphorus effl uent reductions that are practically and economically achievable within the term of the proposed permit, the department and permittee have mutually agreed upon specifi c permit conditions, that include a variance limitation, monitoring of phosphorus at the frequency described in the permit and submittal of reports on source reduction measures, oriented toward attainment of the phosphorus water quality standard. The designated use of the receiving water will not change as a result of the variance. Hearing Date, Time, and Location: Tuesday, July 2, at 9:30 a.m. https://us02web.zoom. us/ meeting/ register/ tZUldOmupz4rGtJLCUq-IQp42hm0rwp29zq3_ Hearing officer, Name, Address, City/ State/Zip and Phone: Victoria Ziegler, 141 NW Barstow St, Waukesha, WI, 53188, (414) 391-8946 The Department of Natural Resources, pursuant to s. 283.49, Wis. Stats, has scheduled for the time and place listed above, a public hearing for the purpose of giving all interested persons an opportunity to make a statement, with
couriersentinel_20240516_ccs-2024-05-16-a-013_art_1.xml
application of waste shall be done in accordance with permit conditions and applicable codes. All land application sites shall be approved prior to their use. To receive a list of approved sites, or to be notifi ed of potential approvals, contact the above-named basin engineer. Proposed Phosphorus Variance: The department has determined that a water quality-based effluent limitation (WQBEL) for phosphorus is needed in this permit to protect water quality. As allowed under s. 283.15, Wis. Stats., Variance to Water Quality Standard, the permittee has requested a variance to the phosphorus WQBEL. In support of this request, the permittee has submitted documentation intended to demonstrate eligibility for the variance based on applicable factors. The department concurs with the demonstration, however this concurrence is subject to U.S. EPA approval, before the variance limit may be included in the final reissued permit. In an effort to achieve phosphorus effl uent reductions that are practically and economically achievable within the term of the proposed permit, the department and permittee have mutually agreed upon specifi c permit conditions, that include a variance limitation, monitoring of phosphorus at the frequency described in the permit and submittal of reports on source reduction measures, oriented toward attainment of the phosphorus water quality standard. The designated use of the receiving water will not change as a result of the variance. Hearing Date, Time, and Location: Tuesday, July 2, at 9:30 a.m. https://us02web.zoom. us/ meeting/ register/ tZUldOmupz4rGtJLCUq-IQp42hm0rwp29zq3_ Hearing officer, Name, Address, City/ State/Zip and Phone: Victoria Ziegler, 141 NW Barstow St, Waukesha, WI, 53188, (414) 391-8946 The Department of Natural Resources, pursuant to s. 283.49, Wis. Stats, has scheduled for the time and place listed above, a public hearing for the purpose of giving all interested persons an opportunity to make a statement, with
3-POINT WALCO ATTACHMENTS _______. __ _.____ ______ __ ___.___ !___'#$ ______ _ _____ ___ ____ % _!& _' _(___'#$ _____ !___

LATEST NEWS